Elena Marchetti

Operations and sustainability consultant, Bologna

I help manufacturers in northern Italy cut energy use and scrap on the shop floor, without stopping the line.

Clients
31 manufacturers since 2017
Typical engagement
6 to 12 weeks, fixed fee
Languages
Italian, English, German

Work

Elena Marchetti in front of a kiln line
1
Shift leads at the weekly energy review
2
Kiln metering panel
3

Kiln energy at a tile maker

2025, Sassuolo

Problem: gas was 38% of production cost and rising, and nobody knew which kilns were the worst.

What I did: metered the four kilns for three weeks, moved firing to two longer cycles a day, and set up a weekly energy review with the shift leads.

Result: gas per square metre down 17% in six months, about EUR 410,000 a year.

Client name withheld at their request.

Operator checking cartons at the end of the line
4
Changeover checklist on the machine guard
5

Scrap on a packaging line

2024, Bologna

Problem: one in eleven cartons was rejected at the end of the line, and the reject bin was emptied before anyone looked at it.

What I did: a two-week reject log by cause, a changeover checklist for the three worst formats, and a short daily stand-up at the line.

Result: rejects down from 9% to 3.5% in ten weeks; the checklist is now used on every line in the plant.

Elena Marchetti on a call with a supplier
6

Supplier emissions for a customer audit

2024, Modena

Problem: a German carmaker asked for Scope 3 data within a quarter, or the contract would go to tender.

What I did: a one-page questionnaire for the 40 largest suppliers, follow-up calls in Italian and German, and a plain spreadsheet model the client now runs alone.

Result: report delivered in nine weeks; the contract was renewed for three years.

View project

Maintenance technician tagging an air leak
7
Leak tags on a pipe run
8
Compressor room
9

Compressed air leaks in a machining plant

2023, Reggio Emilia

Problem: compressors ran all weekend with the plant closed.

What I did: an ultrasonic leak survey, 120 tagged leaks fixed by the maintenance team, and a timer on the weekend supply.

Result: electricity for compressed air down 29%; payback in five months.

About

I spent eleven years in operations at two Emilian manufacturers before going independent in 2017. I still work on the floor, with the people who run the machines, because that is where the savings are.

I take three or four clients at a time. Each engagement starts with a two-day visit and ends with a result we agreed on in writing.

CV

Experience

  • 2017 to nowIndependent consultantEnergy, scrap and supplier data for manufacturers
  • 2011 to 2017Operations manager, packaging manufacturerBologna, three plants
  • 2006 to 2011Process engineer, ceramics groupSassuolo

Education and certification

  • 2006MSc Industrial Engineering, University of Bologna
  • 2019ISO 50001 lead auditor