  1. Kiln energy at a tile maker2025, Sassuolo
  2. Scrap on a packaging line2024, Bologna
  3. Supplier emissions for a customer audit2024, Modena
  4. Compressed air leaks in a machining plant2023, Reggio Emilia
Elena Marchetti in front of a kiln line

Kiln energy at a tile maker

2025, Sassuolo

Problem: gas was 38% of production cost and rising, and nobody knew which kilns were the worst.

What I did: metered the four kilns for three weeks, moved firing to two longer cycles a day, and set up a weekly energy review with the shift leads.

Result: gas per square metre down 17% in six months, about EUR 410,000 a year.

Client name withheld at their request.

Shift leads at the weekly energy reviewKiln metering panel
Operator checking cartons at the end of the line

Scrap on a packaging line

2024, Bologna

Problem: one in eleven cartons was rejected at the end of the line, and the reject bin was emptied before anyone looked at it.

What I did: a two-week reject log by cause, a changeover checklist for the three worst formats, and a short daily stand-up at the line.

Result: rejects down from 9% to 3.5% in ten weeks; the checklist is now used on every line in the plant.

Changeover checklist on the machine guard
Elena Marchetti on a call with a supplier

Supplier emissions for a customer audit

2024, Modena

Problem: a German carmaker asked for Scope 3 data within a quarter, or the contract would go to tender.

What I did: a one-page questionnaire for the 40 largest suppliers, follow-up calls in Italian and German, and a plain spreadsheet model the client now runs alone.

Result: report delivered in nine weeks; the contract was renewed for three years.

View project

Maintenance technician tagging an air leak

Compressed air leaks in a machining plant

2023, Reggio Emilia

Problem: compressors ran all weekend with the plant closed.

What I did: an ultrasonic leak survey, 120 tagged leaks fixed by the maintenance team, and a timer on the weekend supply.

Result: electricity for compressed air down 29%; payback in five months.

Leak tags on a pipe runCompressor room

About

I spent eleven years in operations at two Emilian manufacturers before going independent in 2017. I still work on the floor, with the people who run the machines, because that is where the savings are.

I take three or four clients at a time. Each engagement starts with a two-day visit and ends with a result we agreed on in writing.

CV

Experience

  • 2017 to nowIndependent consultant
    Energy, scrap and supplier data for manufacturers
  • 2011 to 2017Operations manager, packaging manufacturer
    Bologna, three plants
  • 2006 to 2011Process engineer, ceramics group
    Sassuolo

Education and certification

  • 2006MSc Industrial Engineering, University of Bologna
  • 2019ISO 50001 lead auditor
  • 2014Lean Six Sigma Black Belt