Elena Marchetti

Operations and sustainability consultantBologna

I help manufacturers in northern Italy cut energy use and scrap on the shop floor, without stopping the line.

Clients
31 manufacturers since 2017
Typical engagement
6 to 12 weeks, fixed fee
Languages
Italian, English, German

Projects

  1. 1Kiln energy at a tile makerSassuolo2025
  2. 2Scrap on a packaging lineBologna2024
  3. 3Supplier emissions for a customer auditModena2024
  4. 4Compressed air leaks in a machining plantReggio Emilia2023
Elena Marchetti in front of a kiln line
Project

Kiln energy at a tile maker

Year2025
PlaceSassuolo
Sheet1 of 4

Client name withheld at their request.

Problem

Gas was 38% of production cost and rising, and nobody knew which kilns were the worst.

What I did

Metered the four kilns for three weeks, moved firing to two longer cycles a day, and set up a weekly energy review with the shift leads.

Result

Gas per square metre down 17% in six months, about EUR 410,000 a year.

Shift leads at the weekly energy review
Fig. 1.1 Shift leads at the weekly energy review
Kiln metering panel
Fig. 1.2 Kiln metering panel
Operator checking cartons at the end of the line
Project

Scrap on a packaging line

Year2024
PlaceBologna
Sheet2 of 4

Problem

One in eleven cartons was rejected at the end of the line, and the reject bin was emptied before anyone looked at it.

What I did

A two-week reject log by cause, a changeover checklist for the three worst formats, and a short daily stand-up at the line.

Result

Rejects down from 9% to 3.5% in ten weeks; the checklist is now used on every line in the plant.

Changeover checklist on the machine guard
Fig. 2.1 Changeover checklist on the machine guard
Elena Marchetti on a call with a supplier
Project

Supplier emissions for a customer audit

Year2024
PlaceModena
Sheet3 of 4

Problem

A German carmaker asked for Scope 3 data within a quarter, or the contract would go to tender.

What I did

A one-page questionnaire for the 40 largest suppliers, follow-up calls in Italian and German, and a plain spreadsheet model the client now runs alone.

Result

Report delivered in nine weeks; the contract was renewed for three years.

Maintenance technician tagging an air leak
Project

Compressed air leaks in a machining plant

Year2023
PlaceReggio Emilia
Sheet4 of 4

Problem

Compressors ran all weekend with the plant closed.

What I did

An ultrasonic leak survey, 120 tagged leaks fixed by the maintenance team, and a timer on the weekend supply.

Result

Electricity for compressed air down 29%; payback in five months.

Leak tags on a pipe run
Fig. 4.1 Leak tags on a pipe run
Compressor room
Fig. 4.2 Compressor room

About

I spent eleven years in operations at two Emilian manufacturers before going independent in 2017. I still work on the floor, with the people who run the machines, because that is where the savings are.

I take three or four clients at a time. Each engagement starts with a two-day visit and ends with a result we agreed on in writing.

CV

Experience

  • 2017 to nowIndependent consultantEnergy, scrap and supplier data for manufacturers
  • 2011 to 2017Operations manager, packaging manufacturerBologna, three plants
  • 2006 to 2011Process engineer, ceramics groupSassuolo

Education and certification

  • 2006MSc Industrial Engineering, University of Bologna
  • 2019ISO 50001 lead auditor
  • 2014Lean Six Sigma Black Belt

Contact